The President met off site today with the crew from R.H. White about today's work. The crane today (see photo) is larger as it is being used to lift 1600 pound sandbags into place to block the flow so the divers can get the old gate out. Two series of sandbags are planned to block the flow to expose the gate and so the least amount of water is taken out of the lake. The dam owner's hydraulic engineer from Maine continues to be on site. Yesterday a temporary wood frame was put in to guide and hold the new steel gate in position ready too replace the old wood gate. The gate is 2 feet by 2 feet. If things continue to proceed as planned, repairs could be completed ahead of schedule and as early as this afternoon or tomorrow.